Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the essential-addons-for-elementor-lite domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/fvxo4t5om8w8/public_html/wp-includes/functions.php on line 6121
Plant Shutdown and Maintenance Services - TCC Arabia

Plant Shutdown and Maintenance Services

Home / Our Services

Plant Shutdown and Maintenance Services

TCC-KANOO with proven experience in executing plant projects with Saudi Aramco, SABIC & its affiliates, Maaden, Petrochemicals, and Power plants offering the following services;

  • Plant turnaround and shutdown services covering de-bottlenecking, retrofit, and revamping projects.
  • Static equipment cleaning, overhauling, blinding, de-blinding, and box-up activities.
  • Heat exchanger repairs, cleaning, and replacement.
  • Column internals repair and replacement.
  • Vessels & Drums repairs, cleaning, and replacement.
  • Existing in-plant pipeline/piping rehabilitation and maintenance.
  • Valves & Stream Traps overhauling and replacement.
  • Plant-wide industrial Blasting and coating of Tanks, Vessels, Plant piping and structures, Equipment, etc.
  • Fire Proof and Special liquid Coating.
  • Insulation and cladding.